*
१०
14
179
KOWLOON CANTON RAILWAY REPORT.
The present staff of the British Section of the Kowloon- Canton Railway could with but slight augmentation probably run the whole of the Kowloon Canton Railway, both British and
Chinese sections. On the other hand, the comparatively small British section could not in the opinion of the Commissioners
be run with a smaller staff. Whatever the length of the line
it is necessary to have at least one of various kinds of
railway officials and engineers.
2.
Nevertheless there are two economies which the Commission-
ers recommend, and which they consider will at the same time lead
to great efficiency. The first concerns the post of Manager. This is combined with the post of Engineer of Ways and Works. It would be a better arrangement if the post of Manager were combined with that of Traffic Manager, and a separate Engineer of Ways and Works appointed, an engineer is already seconded
for this post from the Public Works Department during the absence on leave of the Manager). There would still be two
officers performing the duties of three posts, but there would
be a slight saving in salaries, and a more logical distribution
of duties.
3.
The second recommendation affecting staff which the Commissioners make, is that the two posts of Traffic Inspectors at present filled by British officers be filled in future by
Portuguese. One of the two officers concerned is already over the retiring age. There will be a considerable saving not only in salaries but in the cost of passages and pensi ons, The Commissioners, whilst realizing that a certain amount of
defrauding of the railway by persons travelling without tickets
is inevitable, are quite satisfied that more could be done to
check the practice. The Traffic Assistant should supervise
No comments yet.
Private notes are available after approval.